AiPT Transparent Header & Navigation
AiPT Header
📞
+92 (213) 5877856
info@iq-cap.com
Reach Us
Premium Navbar
Project Case Study

Hyderabad Mirpurkhas
Dual Carriageway Road

transaction advisory for Hyderabad Mirpurkhas Dual Carriageway Road Project under PPP mode

• Served as Financial and Transaction Advisor for Sindh’s first indigenously structured PPP road project (60-km expressway).
• Validated financial feasibility, structured toll rates, and designed vital risk-mitigation mechanisms (MRG, MSG).
• Provided comprehensive bid evaluation support and facilitated the complex process of reaching financial close.

Location Sindh, Pakistan
Client Deokjae Group of Companies
Duration 2010–2012
Project Cost $74.95M
Project Case Study

Sheikhupura Gujranwala Road
Project under PPP Mode

transaction advisory for Sheikhupura Gujranwala Road Project under PPP Mode

• Spearheaded strategic and financial architecture for a bidding consortium on a 43.4-kilometer BOT road project.
• Facilitated joint venture formation and conducted comprehensive economic feasibility and sensitivity modeling.
• Led negotiations of PPP terms with the government to ensure optimal risk allocation and Value for Money (VfM).

Location Sheikhupura, Punjab, Pakistan
Client HCS-NKB JV, Communication and Works Department (C&WD), Punjab
Duration 2016–2023
Project Cost $21.36M
Project Case Study

Shahrah-e-Bhutto
(Formerly Malir Expressway)

transaction advisory for Malir Expressway Road Project Under PPP Mode

• Acted as Transaction Advisor for the preferred private bidder on a massive 39-km, 6-lane dualized expressway PPP project.
• Managed the entire bid compilation process, developing a competitive strategy, financial models, and VfM assessments.
• Provided expert negotiation support leading to the successful signing of the Concession Agreement and financial close.

Location Karachi, Sindh, Pakistan
Client J.N. & Company
Duration 2019–2020
Project Cost $218.9M
Project Case Study

Dualization of
Chiniot – Sargodha Road

financial advisory for Dualization of Chiniot-Sargodha Road

• Redesigned an unbankable road project by proposing an innovative transaction structure to attract investors.
• Conducted exhaustive technical/market assessments, including specialized traffic and Origin-Destination (O&D) surveys.
• Developed sophisticated financial models and prepared the complete procurement package for a competitive bidding process.

Location Punjab, Pakistan
Client Communication and Works Department (C&WD), Punjab
Duration 2024–2025
Project Cost $82.73M
Project Case Study

Five Punjab O&M Road Packages

Transaction advisory for FIVE Punjab O&M Road Packages

• Provided full transaction lifecycle advisory for five distinct Operation & Maintenance (O&M) road packages covering 431 km.
• Conducted technical need analyses, specialized traffic assessments, and dynamic financial modeling (IRR, VfM).
• Led transaction structuring, mobilized investor interest through roadshows, and managed complete procurement packages.

Location Various Districts across Punjab, Pakistan
Client Communication & Works Department (C&WD), Government of Punjab
Duration 2024–2025
Project Cost $9.71M
Project Case Study

Multan–Vehari Road

transaction advisory for Dualization of Multan – Vehari Road Project Under PPP Mode

• Acted as Transaction Advisor for the private sector proponent to dualize the Multan–Vehari road under a PPP framework.
• Managed bid compilation, including a detailed Financial Model with Sensitivity and Value for Money (VfM) analyses.
• Provided expert support during negotiations to successfully finalize the Concession Agreement.

Location Punjab, Pakistan
Client Kainatt Enterprises – Constructors and Developers
Duration 2020–2022
Project Cost $122.07M
Project Case Study

Tando Muhammad Khan Road

Transaction advisory and Feasibility for Tando Muhammad Khan Road Project Under PPP Mode

• Delivered comprehensive feasibility and transaction advisory to the Government of Sindh for two major highway dualization links.
• Performed technical, financial, and legal due diligence, alongside detailed traffic and socio-economic surveys.
• Recommended the optimal PPP structure, drafted bidding documentation, and secured necessary approvals.

Location Sindh, Pakistan
Client Niaz Muhammad Khan & Brothers / Works and Services Department, GoS
Duration 2015-2023
Project Cost $16.73M
Project Case Study

Illumination of Sukkur Barrage,
Lansdowne & Ayoub Bridges

Feasibility for Illumination of Sukkur Barrage, Lansdowne & Ayoub Bridges

• Served as lead Transaction Advisor for a heritage and RGB illumination project structured under a BFOMT model.
• Developed a comprehensive financial framework evaluating NPV, IRR, and payback periods for a 5.5-year concession.
• Conducted specialized revenue modeling for advertising streams and designed a robust risk management strategy.

Location Sukkur, Sindh, Pakistan
Client Sukkur Municipal Corporation (SMC)
Duration 2025
Project Cost $1.39M